Build an ADU!
Accessory Dwelling Units (ADU) provide much-needed housing units to our community. And in an effort to facilitate the construction of ADUs, the City offers pre-approved construction plans for a one-bedroom (720 SF) and a two-bedroom (960 SF) detached ADU. Designed as a craftsman bungalow, the plans feature a low-pitched, gabled roof with overhanging eaves and a front porch nestled under the roofline. Rooflines can be oriented east/west or north/south to optimize site layout and sun exposure for roof-mount solar.
The City offers expedited permitting for Accessory Dwelling Units. The typical review period is 4 to 6 weeks. City staff is available to help navigate the ADU permitting process. Please stop by the Community Development Department or call 707-961-2827 x111 to be connected to a planner.
The Process
Step 1:
- Choose a plan set from the two preapproved designs.
Step 2:
- Pay initial deposit of $500. These funds will be credited toward building permit fees.
Step 3:
- Engineer will conduct a site visit to the property to confirm the placement of the structure on the proposed site.
Step 4:
- Select qualified professional to prepare California Title 24 Energy Calculations.
Step 5:
- Select appropriate roof orientation and electric solar system.
Step 6:
- Submit the following to the City of Fort Bragg:
- Building Permit Application
- Storm Water Checklist
- Two (2) copies of Title 24 Report
- Two (2) copies of solar plans
- Four (4) preapproved plan sets
- Three (3) sets printed 11" x 17"
- One (1) set printed 18" x 24" or 24" x 36" f) Building Permit Fees ($500 deposit will be credited toward fees).
Step 7:
- Mendocino County Planning and Building Department will contact applicant to pay fees and collect permit.
Preapproved ADU Plans: